Fiber at Boxwood Pole
Fiber coiled and ready to be connected to overhead when it arrives. Current expectation is 2-4 weeks.
Sequence to Boot the Mountain
Remote and base station computer are never turned off. To operate each morning :
- On remote computer (where the operator is sitting)
- start Teamviewer to enable connection to base station (where the radio is located)
- start Skype.Remote to create audio path to the radio
- Using Teamviewer on remote computer
- connect to base station computer
- start Skype.Primary on base station
- From the remote computer, call Skype.Primary from Skype.Remote
- Control program FT2K will power-on all equipment at the base station
- FT-2000
- DTS-4 antenna switch
- LDG Antenna Tuner
- If I'm going to use HRD or other control program
- Power base station equipment using
- Browser interface to IP switch
- Stand-along power switch program
- Start the control program
- FT2K
- HRD
- FT-2000RC
- TRX-Manager
- On the Air! Wasn't that easy!!
Friday, August 14, 2015
Wednesday, August 12, 2015
Monday, August 10, 2015
29 U.S. Scientists Praise Iran Nuclear Deal in Letter to Obama
| |||||||||||
Wednesday, August 5, 2015
Sunday, August 2, 2015
Subscribe to:
Posts (Atom)